diff --git a/shredder/asterix-sm-morren/bazar/output.html b/shredder/asterix-sm-morren/bazar/output.html index 78b182543..8b252c358 100644 --- a/shredder/asterix-sm-morren/bazar/output.html +++ b/shredder/asterix-sm-morren/bazar/output.html @@ -88,18 +88,18 @@

Payment Terms

Industrial machines : 100% of the total cost of the machine(s) to be paid at the moment of the order.
Machines manufactured in-house : + 70% of the total cost of the machine(s) to be paid at the moment of the order. + The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full + payment).

-

70% of the total cost of the machine(s) to be paid at the moment of the order. - The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full - payment).


diff --git a/shredder/asterix-sm-morren/bazar/raw.html b/shredder/asterix-sm-morren/bazar/raw.html index 87db9a75d..fab526ec0 100644 --- a/shredder/asterix-sm-morren/bazar/raw.html +++ b/shredder/asterix-sm-morren/bazar/raw.html @@ -104,8 +104,7 @@ PDF](https://assets.osr-plastic.org/machines//shredder/asterix-sm-morren/resourc

Payment Terms

Industrial machines : 100% of the total cost of the machine(s) to be paid at the moment of the order.
-Machines manufactured in-house : - +Machines manufactured in-house : 70% of the total cost of the machine(s) to be paid at the moment of the order. The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full payment). @@ -118,7 +117,7 @@ payment).
- +
- +