From bb1e056d98729f48717546bfe8ad303c95f352d2 Mon Sep 17 00:00:00 2001 From: Code Date: Fri, 31 Jan 2025 17:33:15 +0100 Subject: [PATCH] Updating - shredder/obelix --- shredder/obelix/bazar/output.html | 8 ++++---- shredder/obelix/bazar/raw.html | 5 ++--- 2 files changed, 6 insertions(+), 7 deletions(-) diff --git a/shredder/obelix/bazar/output.html b/shredder/obelix/bazar/output.html index 4c14109d4..9f7150eab 100644 --- a/shredder/obelix/bazar/output.html +++ b/shredder/obelix/bazar/output.html @@ -110,18 +110,18 @@

Payment Terms

Industrial machines : 100% of the total cost of the machine(s) to be paid at the moment of the order.
Machines manufactured in-house : + 70% of the total cost of the machine(s) to be paid at the moment of the order. + The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full + payment).

-

70% of the total cost of the machine(s) to be paid at the moment of the order. - The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full - payment).


diff --git a/shredder/obelix/bazar/raw.html b/shredder/obelix/bazar/raw.html index 46007b441..262933abf 100644 --- a/shredder/obelix/bazar/raw.html +++ b/shredder/obelix/bazar/raw.html @@ -139,8 +139,7 @@ Powerful dual-axis shredder with sieve, capable of shredding up to 15mm thick pl

Payment Terms

Industrial machines : 100% of the total cost of the machine(s) to be paid at the moment of the order.
-Machines manufactured in-house : - +Machines manufactured in-house : 70% of the total cost of the machine(s) to be paid at the moment of the order. The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full payment). @@ -153,7 +152,7 @@ payment).
- +
- +