Updating - shredder/idefix
This commit is contained in:
parent
fcadea22a5
commit
ede859f726
@ -125,9 +125,6 @@
|
||||
<h3>Payment Terms</h3>
|
||||
<p><b>Industrial machines</b> : 100% of the total cost of the machine(s) to be paid at the moment of the order.<br />
|
||||
<b>Machines manufactured in-house</b> :
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
payment).
|
||||
</p>
|
||||
</li>
|
||||
</ul>
|
||||
|
||||
@ -137,10 +137,7 @@ Small plastic grinder - ideal to grind bigger plastic flakes down to size
|
||||
|
||||
<h3>Payment Terms</h3>
|
||||
<b>Industrial machines</b> : 100% of the total cost of the machine(s) to be paid at the moment of the order.<br/>
|
||||
<b>Machines manufactured in-house</b> :
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
payment).
|
||||
<b>Machines manufactured in-house</b> :
|
||||
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
|
||||
Loading…
Reference in New Issue
Block a user