From f718b58a71b08f373dcfe8ca2636769001d37e31 Mon Sep 17 00:00:00 2001
From: Code Industrial machines : 100% of the total cost of the machine(s) to be paid at the moment of the order. 70% of the total cost of the machine(s) to be paid at the moment of the order.
+ 70% of the total cost of the machine(s) to be paid at the moment of the order.
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
- payment).
Machines manufactured in-house :
-
|
-
+
|
diff --git a/injection/elena-zmax/bazar/raw.html b/injection/elena-zmax/bazar/raw.html
index 9b27b894f..b48092793 100644
--- a/injection/elena-zmax/bazar/raw.html
+++ b/injection/elena-zmax/bazar/raw.html
@@ -138,8 +138,7 @@ Arbor injection machine
|
-
+
|