Updating - shredder/obelix
This commit is contained in:
parent
ede859f726
commit
b4f4e33432
@ -123,9 +123,6 @@
|
||||
<h3>Payment Terms</h3>
|
||||
<p><b>Industrial machines</b> : 100% of the total cost of the machine(s) to be paid at the moment of the order.<br />
|
||||
<b>Machines manufactured in-house</b> :
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
payment).
|
||||
</p>
|
||||
</li>
|
||||
</ul>
|
||||
|
||||
@ -143,10 +143,7 @@ Powerful dual-axis shredder with sieve, capable of shredding up to 15mm thick pl
|
||||
|
||||
<h3>Payment Terms</h3>
|
||||
<b>Industrial machines</b> : 100% of the total cost of the machine(s) to be paid at the moment of the order.<br/>
|
||||
<b>Machines manufactured in-house</b> :
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
payment).
|
||||
<b>Machines manufactured in-house</b> :
|
||||
|
||||
70% of the total cost of the machine(s) to be paid at the moment of the order.
|
||||
The 30% left + transport fees to be paid at reception of tracking number of the shipping (no machine leaves the workshop without full
|
||||
|
||||
Loading…
Reference in New Issue
Block a user