806 B
806 B
| title | slug | step | howto | tags | category | difficulty | time | location | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Having the Mold Made! | having-the-mold-made | 2 | skate-rails-how-2-make--use-recycled-skate-rails |
|
Products | Easy | < 1 hour | Los Angeles, United States of America (the) |
Step 2: Having the Mold Made!
If you purchase my mold, it will arrive in approximately 4 weeks (28 days).
If you acquire my mold design or create your own design, you will receive the digital file; however, the mold will still need to be fabricated. You have two options:
